Files
famapp/docs/tasks
ginnoir c73338e256 Code-side
src/lib/dev-login-config.ts — startup assertion: throws if NODE_ENV=production + ENABLE_DEV_LOGIN=true, scoped to runtime (skipped during next build).
Container

scripts/migrate.mjs — runs Drizzle migrations against DATABASE_URL.
deploy/docker-entrypoint.sh — runs migrations then exec node server.js. Skip with RUN_MIGRATIONS=false.
Dockerfile — copies drizzle/, scripts/migrate.mjs, entrypoint into runner stage; ENTRYPOINT now points at the script.
Compose

deploy/compose.yaml — famapp now image: ${FAMAPP_IMAGE:-ghcr.io/ginnoir/famapp:latest} (build still works locally as fallback). Authentik pinned via AUTHENTIK_IMAGE_TAG (default 2024.12.3). New RUN_MIGRATIONS env passed through.
.env.production.example — documents FAMAPP_IMAGE, AUTHENTIK_IMAGE_TAG, RUN_MIGRATIONS.
CI/CD

.github/workflows/ci.yml — push/PR: typecheck + lint + format:check + build.
.github/workflows/release.yml — v* tag: build + push ghcr.io/ginnoir/famapp:vX.Y.Z, :X.Y, :latest to GHCR.
Docs

deploy/README.md — full deploy/rollback/release runbook.
CHANGELOG.md — release log seeded with an Unreleased entry.
docs/tasks/09-pre-deploy-checklist.md — task 09 reframed from one-shot removal to a recurring pre-deploy checklist.
STATUS.md — updated.
Verified: pnpm typecheck, pnpm format, pnpm build, and docker compose config all clean.
2026-05-06 17:37:37 -05:00
..
2026-05-06 17:37:37 -05:00
2026-05-06 17:37:37 -05:00
2026-05-06 17:37:37 -05:00
2026-05-06 17:37:37 -05:00
2026-05-06 17:37:37 -05:00

Task briefs

Each file here is a self-contained brief for a sub-session (typically Sonnet) to execute one chunk of work. Briefs assume the executor has read /CLAUDE.md — do not restate the stack or architecture there.

How to use a brief

  1. Read /CLAUDE.md first.
  2. Read the task file end-to-end.
  3. Stop when all acceptance criteria pass. Do not bolt on extra scope.
  4. If a brief turns out to be wrong, update the brief in the same commit as the code.

Brief format

Every task file has these sections:

  • Goal — one sentence.
  • Why — what this unlocks; how it fits the larger plan.
  • Depends on — task numbers that must be done first.
  • Scope — bullet list of what to build.
  • Out of scope — explicit non-goals to prevent drift.
  • Acceptance criteria — checkable list. Done = all checked.
  • Notes — gotchas, recommended libs, sketches.

Phase index

Phase 1 — Scaffold

Phase 2 — Core modules

Phase 3 — Dashboard & UX

Phase 4 — Sharing

Phase 5 — Notifications & reminders

Phase 6 — PWA polish

Phase 7 — Hardening