Files
ginnoir 76f68548b2 docs: complete Phase 9 backlog triage (issues map, briefs, ADRs)
Map design IDs to Gitea #1-#37, add tasks 80-88, stub ADRs 0004-0006,
and point STATUS at the P1 batch order.
2026-07-04 01:23:30 -05:00

3.8 KiB

Task briefs

Each file here is a self-contained brief for a sub-session (typically Sonnet) to execute one chunk of work. Briefs assume the executor has read /CLAUDE.md — do not restate the stack or architecture there.

How to use a brief

  1. Read /CLAUDE.md first.
  2. Read the task file end-to-end.
  3. Stop when all acceptance criteria pass. Do not bolt on extra scope.
  4. If a brief turns out to be wrong, update the brief in the same commit as the code.

Brief format

Every task file has these sections:

  • Goal — one sentence.
  • Why — what this unlocks; how it fits the larger plan.
  • Depends on — task numbers that must be done first.
  • Scope — bullet list of what to build.
  • Out of scope — explicit non-goals to prevent drift.
  • Acceptance criteria — checkable list. Done = all checked.
  • Notes — gotchas, recommended libs, sketches.

Phase index

Phase 1 — Scaffold

Phase 2 — Core modules

Phase 3 — Dashboard & UX

Phase 4 — Sharing

Phase 5 — Notifications & reminders

Phase 6 — PWA polish

Phase 7 — Hardening

Phase 8 — Garden module

Phase 9 — Post-v0.1

Batch order (bugs → API → editor/notes → journal → agent). Design: docs/superpowers/specs/2026-07-03-backlog-triage-design.md. Issue map: docs/issues-map.md.