Commit Graph
2 Commits
Author SHA1 Message Date
ginnoir c73338e256 Code-side
src/lib/dev-login-config.ts — startup assertion: throws if NODE_ENV=production + ENABLE_DEV_LOGIN=true, scoped to runtime (skipped during next build).
Container

scripts/migrate.mjs — runs Drizzle migrations against DATABASE_URL.
deploy/docker-entrypoint.sh — runs migrations then exec node server.js. Skip with RUN_MIGRATIONS=false.
Dockerfile — copies drizzle/, scripts/migrate.mjs, entrypoint into runner stage; ENTRYPOINT now points at the script.
Compose

deploy/compose.yaml — famapp now image: ${FAMAPP_IMAGE:-ghcr.io/ginnoir/famapp:latest} (build still works locally as fallback). Authentik pinned via AUTHENTIK_IMAGE_TAG (default 2024.12.3). New RUN_MIGRATIONS env passed through.
.env.production.example — documents FAMAPP_IMAGE, AUTHENTIK_IMAGE_TAG, RUN_MIGRATIONS.
CI/CD

.github/workflows/ci.yml — push/PR: typecheck + lint + format:check + build.
.github/workflows/release.yml — v* tag: build + push ghcr.io/ginnoir/famapp:vX.Y.Z, :X.Y, :latest to GHCR.
Docs

deploy/README.md — full deploy/rollback/release runbook.
CHANGELOG.md — release log seeded with an Unreleased entry.
docs/tasks/09-pre-deploy-checklist.md — task 09 reframed from one-shot removal to a recurring pre-deploy checklist.
STATUS.md — updated.
Verified: pnpm typecheck, pnpm format, pnpm build, and docker compose config all clean.
2026-05-06 17:37:37 -05:00
ginnoir 09d6adbf18 Calendars as entities, uniform widget contract, multi-dashboard tasks
Architecture refinements before module work begins:

- Calendars become first-class entities (mirror of lists). Each
  calendar has its own visibility (private | household) and is
  independently shareable. Updated CLAUDE.md data model and task 10.

- Drop the singleton/parameterized split for dashboard widgets. Every
  widget declares a configSchema + defaultConfig + resolveConfigOptions
  and every placement is an independent instance — same widgetId can
  appear multiple times on one dashboard pointed at different things.
  Updated task 04 contract; tasks 11/12 widget sections aligned.

- Add tasks 25 (multiple dashboards per user) and 26 (customizable
  layout + widget configuration). Replaces the previously-considered
  three-task plan with a cleaner two-task split that the uniform
  contract enables. Phase 3 index updated; STATUS records the rationale.

- Task 20 reframed as a single-dashboard MVP that exercises the new
  contract end-to-end before the customization layer lands.
2026-05-06 01:14:49 -05:00