Populates the decisions index with the two existing ADRs (list SSE/notify,
release workflow). Adds task 09 to the phase 1 list and adds the phase 8
garden module task entries to the task index.
Architecture refinements before module work begins:
- Calendars become first-class entities (mirror of lists). Each
calendar has its own visibility (private | household) and is
independently shareable. Updated CLAUDE.md data model and task 10.
- Drop the singleton/parameterized split for dashboard widgets. Every
widget declares a configSchema + defaultConfig + resolveConfigOptions
and every placement is an independent instance — same widgetId can
appear multiple times on one dashboard pointed at different things.
Updated task 04 contract; tasks 11/12 widget sections aligned.
- Add tasks 25 (multiple dashboards per user) and 26 (customizable
layout + widget configuration). Replaces the previously-considered
three-task plan with a cleaner two-task split that the uniform
contract enables. Phase 3 index updated; STATUS records the rationale.
- Task 20 reframed as a single-dashboard MVP that exercises the new
contract end-to-end before the customization layer lands.
Multi-theme × {light, dark} per-user theming, switchable on the fly.
Slots into phase 1 before modules start so the token system is the
foundation rather than a retrofit. Update STATUS to point at task 03
correctly and reflect 08 in the phase 1 roadmap.