Commit Graph
5 Commits
Author SHA1 Message Date
ginnoir 5b434702ba Add notes module 2026-05-06 04:10:50 -05:00
ginnoir 7e3ae6eb04 Implement lists module and dev login setup 2026-05-06 03:49:03 -05:00
ginnoir 09d6adbf18 Calendars as entities, uniform widget contract, multi-dashboard tasks
Architecture refinements before module work begins:

- Calendars become first-class entities (mirror of lists). Each
  calendar has its own visibility (private | household) and is
  independently shareable. Updated CLAUDE.md data model and task 10.

- Drop the singleton/parameterized split for dashboard widgets. Every
  widget declares a configSchema + defaultConfig + resolveConfigOptions
  and every placement is an independent instance — same widgetId can
  appear multiple times on one dashboard pointed at different things.
  Updated task 04 contract; tasks 11/12 widget sections aligned.

- Add tasks 25 (multiple dashboards per user) and 26 (customizable
  layout + widget configuration). Replaces the previously-considered
  three-task plan with a cleaner two-task split that the uniform
  contract enables. Phase 3 index updated; STATUS records the rationale.

- Task 20 reframed as a single-dashboard MVP that exercises the new
  contract end-to-end before the customization layer lands.
2026-05-06 01:14:49 -05:00
ginnoir 35a14b81c9 Add task 08 — theming infrastructure
Multi-theme × {light, dark} per-user theming, switchable on the fly.
Slots into phase 1 before modules start so the token system is the
foundation rather than a retrofit. Update STATUS to point at task 03
correctly and reflect 08 in the phase 1 roadmap.
2026-05-06 00:56:17 -05:00
ginnoir b89690a9f2 Initial scaffold: tooling, plan, task briefs
- pnpm 10 workspace + TypeScript strict + ESLint flat + Prettier
- CLAUDE.md as canonical brief
- docs/tasks/ — 22 task briefs broken out by phase for sub-sessions
- docs/decisions/ — ADR scaffold

Implements task 01 (repo-init).
2026-05-06 00:05:50 -05:00